On 25 December, 2023, Inner Mongolia Power Grid achieved a milestone by surpassing 100 GW in installed capacity, with new energy sources increasing from 12.01 GW to 44.63 GW since 2013. The anticipated new energy power generation for CY'23 is projected to be 85 TWh, reflecting a 22% y-o-y increase. Inner Mongolia Power Group is actively driving the development of new energy.