--This notification may be called the Environment Impact Assessment Notification, 2020 (hereinafter referred to as 'EIA Notification, 2020') and shall come into force on the date of publication of final notification in the Official Gazette.

--The government of India has issued notification for amendments the Environment Clearance (EC) or Prior Environment Permission (EP) for the steel industries including others who are affecting nature with their critical work activities. It has been notified that the current activities/industries are must to have EC or EP, this is also applicable on new projects or activities including expansion or modernization of projects or activities.

--That activities have been categorized under the category of 'A' 'B1' and 'B2' based on the potential social and environmental impacts and spatial extent of these impacts. These are required to be placed before Appraisal Committee as specified in the Schedule, shall require Prior Environment Clearance from the concerned Regulatory Authority before the start of any construction work or installation or establishment or excavation or modernization, whichever is earlier, on site or before expanding the production and/or project area beyond the limit specified in the prior-EC or prior-EP, as the case may be, granted earlier.

What do these categories signify ?

- All projects under Category 'A' in the Schedule including expansion and modernization of existing projects shall require prior-EC from the Ministry.

-- All projects under Category 'B1' in the Schedule, including expansion and modernization of existing projects, but excluding those which fulfill the General Conditions defined under sub-clause (30) of clause 3 of this notification, shall require prior-EC from the SEIAA or UTEIAA, as the case may be.

-- All projects under Category 'B1' in the Schedule including expansion and modernization of existing projects, and those which fulfill the General Conditions defined under sub-clause (30) of clause 3 of this notification, shall require prior-EC from the Ministry without any change in the category of the project.

-- All projects under Category 'B2' that are required to be placed before Appraisal Committee as specified in the Schedule, shall require prior-EC from the SEIAA or UTEIAA, as the case may be.

-- All other projects under Category 'B2' (other than those projects specified under subclause (5) above), shall require prior-EP from the SEIAA or UTEIAA, as the case may be. These projects shall not be placed before Appraisal Committee.

Classification of steel making units

--For instance sponge iron plant projects >0.5 MnT pa are classified under 'A' category and those with <= 0.5 MnT pa are classified under 'B1' category

-- Similarly the integrated steel plants with >1 MnT of crude steel pa and those with <= 1 MnT pa crude steel are classified under 'A' and 'B1' category respectively

--Similarly the ferro alloy plants with >1.5 lakh tonnes pa and those with <= 1.5 lakh tonnes pa are classified under 'A' and 'B1' category respectively

-- All projects of Pellet plants or agglomeration plants are classified under B1 category

--It is, however, clarified that 'construction work' for the purpose of this notification shall not include securing the land by fencing or compound wall; temporary shed for security guard(s); leveling of the land without any tree felling; geo-technical investigations if any required for the project.

Categorization of projects and activities: -

-- All projects concerning national defence and security or involving other strategic considerations, as determined by the Central Government, shall require prior-EC or prior-EP, as the case may be, from the Ministry without any change in the category of the project. Further, no information relating to such projects shall be placed in the public domain.

List of projects requiring prior Environment clearance or prior ENVIROMENT Permission

Project Category with threshold limit Conditions if any
A B1 B2
(1) (2) (3) (4) (5) (6)
1 (a) Mining of Minor Minerals >100 hectare of mining lease area > 5 hectares and <= 100 hectares of mining lease area < 5 hectares of mining lease area Note:
(1) Mining of minor mineral projects with mine lease area more than 2 hectare and up to 5 Ha shall be shall be referred to Distract Level Expert Appraisal Committee
(2) Mining lease area includes cluster situation
2 Offshore and Onshore
Oil & Gas including CBM and Shale Gas
a) Exploration -- -- All projects
b) Development and Production
(including infrastructure facilities e.g. Gas Collecting or
Gathering Station, Early production Systems, pipelines,
etc.).
All projects -- --
3 Thermal Power 500 megawatts (coal/lignite/naphtha
& gas based);
> 5 megawatts
and < 500 megawatts (coal/lignite /naphtha & gas based);
100 megawatts (all other fuels). 5 megawatts
and < 100
megawatts (all other fuels except biomass and municipal solid non-hazardous waste);
> 5 megawatts and
< 15 megawatts, based on biomass or non-hazardous municipal solid
waste using auxiliary fuel such as coal, lignite/petroleum products
up to 15%.
> 15 megawatts
and < 100
megawatts (using municipal solid non-hazardous waste/ biomass as fuel).
4 Nuclear Power or
processing of nuclear fuel
All projects -- --
5 Coal washeries 1 million ton per annum throughput of coal < 1million ton per annum throughput of coal -- If Coal washery is located within mining lease area, the proposal shall be appraised together with the mining proposal. Note: If Mineral Beneficiation plant located within mining lease area the proposal shall be appraised together with the mining proposal.
6 (a) Mineral Beneficiation involving physical process and physico-chemical process -- All projects Small and Medium enterprises
(b) Chemical processing of ores/concentrate 1.0 million ton per annum throughput < 1.0 million ton per annum throughput
7 Pellet plants or agglomeration plants -- All Projects Small and Medium enterprises
8 Metallurgical industries (ferrous
&non ferrous)
(a) Integrated Steel Plants > 1 million ton per annum of crude
steel
< 1 million ton per annum of
crude steel
--
9 Metallurgical industries (ferrous &non ferrous)
(a) Integrated Steel Plants > 1 million ton per annum of crude
steel
< 1 million ton per annum of
crude steel
10

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(b) Sponge Iron
Plants
> 0.5 million ton per
annum
< 0.5million ton per annum
(c) Non-ferrous
smelting and refining
All projects
(d) Ferro Alloy
Plants
> 1.5 Lakh ton per
annum
<= 1.5 Lakh ton per
annum
(e) Secondary metallurgical industry (Toxic
metals)
>= 20,000 ton per annum < 20,000 ton per annum --
(f) Secondary metallurgical industry (Non- toxic metals) -- (i) Foundries involving furnaces such as Induction Furnace or
Electric Arc
Furnace or
submerged arc furnace or other gas-based furnaces with capacity
more than
1,50,000 ton per annum
(i) Foundries involving furnaces such as Induction Furnace or Electric Arc Furnace or Submerged arc furnace or other gas-based furnaces, with capacity more than 1,00,000 ton per annum to 1,50,000 ton per annum
(ii) Foundries involving furnaces such as cupola and other furnaces with capacity
more than
1,00,000 ton per annum
(ii) Foundries involving furnaces such as cupola or other furnaces using coal with capacity more than 60, 000 ton per annum to 1,00,000 ton per annum
(iii) Standalone re- rolling mills involving pickling with a capacity more than 1, 00, 000 ton per annum.
(iv) Standalone re- rolling mills not involving pickling with a capacity more than 2, 00, 000 ton per annum.
(v) Medium enterprises
11 (a) Cement Plants 1.0 million ton per annum production
capacity except plants with vertical shaft kiln.
(i) <1.0 million ton per annum production capacity
(ii) All cement plants with vertical shaft kiln.
Small and Medium enterprises. Note:
Fuel for cement industry may be coal, petcoke, mixture of coal and petcoke and co- processing of waste provided it meets the emission standards.
(b) Standalone clinker grinding units -- 3 1.0 million ton per annum
production
(i) Stand-alone grinding units up to
1 million ton per
capacity annum
(ii) All standalone grinding units in case of
transportation of clinker and
finished product proposed through rail / sea mode.
(iii) Small and Medium enterprises.
12 Lead acid battery manufacturing (excluding assembling and charging of lead acid
battery)
-- All projects --
13 Petroleum refining
industry
All projects -- --
14 (a) Coke oven plants 0.8 million ton per
annum
< 0.8 million ton per annum --
(b) Coal Tar processing units or Calcination plants -- All projects --
15 Asbestos milling and asbestos based
products
All projects -- --
16 Chlor-alkali industry or Production of Halogens 300 ton per day production capacity
if a unit located outside the notified industrial estates.
(i) 3300 ton per day production
capacity if a unit located within the notified industrial estates.
(ii) <300 ton per day and located outside the notified industrial
estates.
<300 ton per day production capacity if a unit located within the notified industrial estates. Note:
No new Mercury Cell based plants will be permitted and existing units converting to membrane cell technology are exempted from the Notification if provided there is no increase in the production capacity.
17 Soda ash Industry All projects -- -- --
18 Skin/hide processing including tanning industry All projects located outside the notified industrial estates. All projects located within notified industrial estates. All projects of leather production without tanning and located within the notified
industrial estates.
19 Chemical fertilizers and standalone ammonia plants. (i) All projects except Single Super Phosphate including Sulphuric acid. Single Super Phosphate including sulphuric acid
production.
--
20 Building Construction and Area Development projects -- >1,50,000 sq. (i) > 20,000 sq.
mtrs. of built-up area and or total land area of > 50 hectare mtrs. and <50,000 sq. mtrs. of built-up area 1. Projects under (i) and
(ii) > 50,000 sq. (ii) of Column (5) shall not be referred to Appraisal Committee.